AI Construction Cost Control (EVM)
Enterprise cost engineering suite (AACE / PMI EVM): CBS/WBS, change orders, EVM, Monte Carlo, What-If, retention, cash flow, plus a full 16-sheet Excel handover pack, PDF, and charts. Processing via Boh AI servers.
Who is it for?
International AEC contractors needing cost control and board-level financial intelligence
How it works — step by step
- Select Cost Control under BOQ & Documentation — the suite opens.
- Fill project/contract/currency data, or use Quick sample.
- Build CBS manually or paste notes and run AI parse (15 pts).
- Review EVM / Monte Carlo / What-If, then export Excel or PDF.
How to get the best result
EVM, Monte Carlo, What-If, and exports run locally at zero cost. Only the three AI actions deduct points.
Pro tips
- Set an accurate cutoff date so PV is meaningful.
- Fill O/M/P on items before Monte Carlo for a sharper P90 buffer.
- Use What-If to stress-test inflation or delay before locking contingency.
Example
Example: Fit-out project → Quick sample → EVM analytics → AI insights → export PDF for the board.
FAQ
What is "AI Construction Cost Control (EVM)" in Boh AI?
Enterprise cost engineering suite (AACE / PMI EVM): CBS/WBS, change orders, EVM, Monte Carlo, What-If, retention, cash flow, plus a full 16-sheet Excel handover pack, PDF, and charts. Processing via Boh AI servers.
Who is this tool for?
International AEC contractors needing cost control and board-level financial intelligence
How do I get the best result?
EVM, Monte Carlo, What-If, and exports run locally at zero cost. Only the three AI actions deduct points.
Can I try it for free?
Yes. Create a free Boh AI account with your email and get welcome points to try the platform, then pick a plan when you need more. Some advanced tools are available to subscribers only.
Does it support Arabic and English?
Yes. Boh AI is fully bilingual (Arabic & English): interface, guides and results — write your request in either language.
